ENERGY SERVICES PROJECTS

surreystores

Transformer Foundations

  • Project Location:

    Surrey, BC

  • Client:

    BC Hydro

  • Project Completion:

    May 2012

  • Scope:

    Installation of four new concrete transformer foundations. Works included excavation, backfill, installation of new drainage catch basins, electrical power kiosks, asphalt paving.

  • Captital Cost:

    $600,000

rocanville

2 New 138KV Substations

  • Project Location:

    Rocanville and Scissors Creek, Sask

  • Client:

    ABB / Black & McDonald

  • Project Completion:

    November 30, 2011

  • Scope:

    Construction of 2 new 138kV Substations complete with civil and concrete works, including; oil containment pits, tunnels, trenching, transformer pads, blast walls, suspended slabs, retaining walls, housekeeping pads.

  • Captital Cost:

    $2,250,000

alternate_hydrogen_lrg_a6d54be6dde83962e5d8eafaf817fd0e

Hydrogen Fueling Station

  • Project Location:

    North Vancouver, BC

  • Client:

    HTEC / Sacre-Davey Engineering

  • Project Completion:

    June 2011

  • Scope:

    Construct and then de-comission hydrogen fuelling station on Dollarton Highway.

  • Captital Cost:

    $185,000

mission_hospital_duct_bank_Cropped

29KV Duct Bank

  • Project Location:

    Mission, BC

  • Client:

    Houle Electric, BC Hydro, Mission Memorial Hospital

  • Project Completion:

    November 2010

  • Scope:

    Excavate and install 250m of cast in-place and direct bury duct bank. This project also included construction of a concrete Transformer Pad. Additionally, all the duct banks required breaking into the existing electric room for terminations.

  • Captital Cost:

    $50,000

Power Distribution Project

Power Distribution Project

  • Project Location:

    Richmond, BC

  • Client:

    Richmond Steel/Lex Engineering

  • Project Completion:

    November 2010

  • Scope:

    Power distribution, civil, concrete, and directional drilling.

  • Captital Cost:

    $350,000

Diesel Generating Station

Diesel Generating Station

  • Project Location:

    Toad River, BC

  • Client:

    BC Hydro / WTI

  • Project Completion:

    October 2010

  • Scope:

    Civil, grounding and overhead works for new Generating Station.

  • Captital Cost:

    $425,000

540kv_tower_leg_repairs

500K Transmission Tower Repairs

  • Project Location:

    Edmonton & Calgary , AB

  • Client:

    AltaLink Alberta / MVA

  • Project Completion:

    October 2010

  • Scope:

    Civil works associated with transmission tower repairs.

  • Captital Cost:

    $50,000

138K Substation

138K Substation

  • Project Location:

    Stewart, BC

  • Client:

     BC Hydro

  • Project Completion:

    September 2010

  • Scope:

    Civil and grounding works within energized substation.

  • Captital Cost:

    $530,000

Okanagan Transmission Reinforcement

Okanagan Transmission Reinforcement (OTR)

  • Project Location:

    Okanagan Valley, BC

  • Client:

    Fortis BC/BC Hydro/Allteck

  • Project Completion:

    July 2010

  • Scope:

    All access roads, bridges, culverts and remediation.  Construct over 250 new cast-in-place concrete and direct-bury structures. Helicopter access was required to many structure locations.

  • Captital Cost:

    $5,900,000

138kv_energized_structure_replacement

Transmission Line Structure Replacement 138KV

  • Project Location:

    Lethbridge, AB

  • Client:

    City of Lethbridge

  • Project Completion:

    June 2010

  • Scope:

    All civil works for replacement of 59 old structures with new.

  • Captital Cost:

    $450,000

airport_69kv

Airport 69KV Reinforcement Project

  • Project Location:

    Richmond, BC, 

  • Client:

    BCTC/BC Hydro

  • Project Completion:

    November 2009

  • Scope:

    All civil works for new 69kV Transmission Line.

  • Captital Cost:

    $250,000